The Planning Board will host a public hearing to discuss findings in the final report of the Rts. 202/33 Corridor Study at 6:30pm on Monday, July 25, 2022 via Zoom. The Zoom meeting link is: https://us02web.zoom.us/j/84438382627?pwd=d09abVNMdjRyUDg3UjQ1Nk8rR09BQT09

A PDF of the January 2022 Final Report and other materials is available at: https://www.southhadley.org/294/Planning-Documents

Shadowbrook Estate is located within the South Hadley study area, which focuses on Route 33 from the Chicopee town line through the intersection with Route 202 and then on to the Granby town line, was done in conjunction with those adjacent communities. While this area includes destinations such as Buttery Brook Park and the South Hadley Square (Big Y) Shopping plaza within walking distances of neighborhoods, non-vehicular access is poor and the corridor isn’t linked to regional bike trails and paths. Sidewalks vary in quality and location, there is no public transportation, and most of the traffic on workdays originates outside of South Hadley. New zoning for mixed use, village-center style development could help to increase the corridor’s economic vibrancy and accommodate some of our community’s need for different types of housing.

For more details, see the Page 1 story in the July 8, 2022 Town Reminder:
https://www.townreminder.turley.com/tr-archives/TRM070822.pdf

Public Hearing on Rts. 33/202 Corridor Study